top of page
Search

Friday Night Power Washing

As we know they're power washing the parking lot and repainting. They are planning on doing the main entrance on Friday night into Saturday morning. So we may see it down to one lane blocked by cones.

33 views0 comments

Recent Posts

See All

Accrued Leave is done

Management is looking over the leave and we should start accumulated leave tomorrow morning. Accumulated is one day at a time until we run out of days/hours to bid. The first pp of the leave calendar

Round 5 is done

Here is the link to the pdf copy of the leave up to this point: https://drive.google.com/file/d/1Kw666ZnOatYHUOam8OmJSPFSosLpcj0y/view?usp=drive_link Round 6 is starting and is the same as round 5. Th

Round 4 is done

The round 4 is done and the pdf is in the local drive. Please check for accuracy. https://drive.google.com/file/d/1pD6xYDCejxVgNc8S6ir1cCDTDmm9BCnz/view?usp=drive_link Round 5 will start shortly.

Post: Blog2_Post
bottom of page